Difference between revisions of "MOLLER PQB Meeting March 13, 2024"

From Ciswikidb
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
'''Agenda:'''  
 
'''Agenda:'''  
  
1- Two major MOLLER beam studies in April:
+
1- '''Two major MOLLER beam studies in Hall A:'''
# FFB in Hall A:  
+
# '''FFB in Hall A:''' (tentatively scheduled on April 17)
## BSList to start Hall A April run with FFB ON - Ryan Bodestein
+
## BSList to start Hall A April run with FFB ON - Ryan Bodestein: [[media:HallA_FFB_Test_Planning.pdf]]  [[media:HallA_FFB_Test_Planning.pptx]] [https://tasklists.jlab.org/bslist/tasks/111279]
## BSList to measure PQB beam in Hall A helicity flip of 2 kHz (Caryn Palatchi) and to measure monitor (BPMs, BCMs) resolution (Devi Adhikari) [https://tasklists.jlab.org/bslist/tasks/109569]
+
## BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution [https://tasklists.jlab.org/bslist/tasks/109569]
# K-Long Beam Loading:
+
# '''K-Long Beam Loading:''' (tentatively scheduled on May 1)
 
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman [https://tasklists.jlab.org/bslist/tasks/111261]
 
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman [https://tasklists.jlab.org/bslist/tasks/111261]
 
## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi
 
## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi

Latest revision as of 14:45, 13 March 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- Two major MOLLER beam studies in Hall A:

  1. FFB in Hall A: (tentatively scheduled on April 17)
    1. BSList to start Hall A April run with FFB ON - Ryan Bodestein: media:HallA_FFB_Test_Planning.pdf media:HallA_FFB_Test_Planning.pptx [1]
    2. BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution [2]
  2. K-Long Beam Loading: (tentatively scheduled on May 1)
    1. BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman [3]
    2. BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi