Difference between revisions of "MOLLER PQB Meeting June 26, 2024"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "In person in MCC Conference Room and with Zoom. https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam -- '''Agenda:''' * '''Beam Study Results:''' # FFB/FF in Hal...")
 
 
(5 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
* '''Beam Study Results:'''  
 
* '''Beam Study Results:'''  
  
# FFB/FF in Hall A
+
# FFB/FF in Hall A: [[media:2024April_FFBtest_Results.pdf]]
 +
## Check S/H wiring of the Hall A BPMs in BSY
 +
## Check FFB ON versus OFF in QWeak data
  
  
Line 15: Line 17:
  
 
# Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
 
# Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
 +
# No progress on Gun replacement
 +
# Four out of six MFX solenoids are fixed
 +
 +
 +
* '''MOLLER needs new rack in ISB - IN03B25'''

Latest revision as of 14:27, 29 June 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

  • Beam Study Results:
  1. FFB/FF in Hall A: media:2024April_FFBtest_Results.pdf
    1. Check S/H wiring of the Hall A BPMs in BSY
    2. Check FFB ON versus OFF in QWeak data


  • Injector Upgrade Progress:
  1. Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
  2. No progress on Gun replacement
  3. Four out of six MFX solenoids are fixed


  • MOLLER needs new rack in ISB - IN03B25