* '''Injector Beam Studies:'''
 
* '''Injector Beam Studies:'''
# Parasitic Parity DAQ Checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 uA is scheduled.
+
# Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
# MOLLER DAQ tests to 1D at 65 uA : Sunday December 15th Day and Swing shifts. A this time, MOLLER can change beam current, Helicity Board settings, etc.  
+
# MOLLER DAQ tests to 1D at 65 µA: Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.  
  
* '''MOLLER Beam Studies:''' Wien Flip Table — [[media:PQB_Wien_plans.xlsx]]
 
  
 +
* '''MOLLER Beam Studies:''' Wien Flip Table — [[media:PQB_Wien_plans_Jan2025.xlsx]]
  
* '''Fast Feedback Plans:''' first draft — [[media:FastFeedback_Plans.pdf]]
+
 
 +
* '''Fast Feedback Plans:''' [[media:FastFeedback_Plans.pdf]]  [[media:FastFeedback_Plans.docx]]

Latest revision as of 06:16, 17 December 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--


Agenda:


  • Injector Beam Studies:
  1. Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
  2. MOLLER DAQ tests to 1D at 65 µA: Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.