Line 28: | Line 28: | ||
'''Notes from this meeting:''' | '''Notes from this meeting:''' | ||
− | * Bubble Chamber ... | + | * Bubble Chamber: still looking for a solution to the nuclearations at the interface between mercury and the N2O. |
+ | # Tried CO2 but the problem got worse | ||
+ | # Tried C4F10 as an intermediate buffer fluid but it mixes with N2O | ||
+ | # Concluded that it is not a result of thermal hot spot on the surface of mercury | ||
+ | # Next: | ||
+ | ## will try differential cooling of mercury | ||
+ | ## Otherwise will have to design and build a chamber with no buffer fluid | ||
+ | |||
+ | * Beamline drawings submitted to machine shop and due back at the start of August. The installation is planned in August and to be completed by the end of August. | ||
+ | |||
+ | * Meekins will make the collimator from copper on site (i.e, we do not need the copper from Argonne). | ||
+ | |||
+ | * Argonne to provide a list of cables need to run the bubble chamber. | ||
+ | |||
+ | * Planning to measure the photon spectra using a germanium detector. Will check with the Detector Group and with RadCon to see if we can borrow one. |
Revision as of 15:51, 12 July 2014
We will meet in TL 2236 on Wednesday July 9 at 3:30 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1- Bubble Chamber progress at Argonne
2- Summer Shutdown Installation:
- JLab beam line fabrication update
- Argonne installation at CEBAF
- 1. Rack space, cable pulls, and remote operation
- 2. What is plan and timeline for moving components to JLab, installing at CEBAF, testing?
3- Fall Operations:
- Accelerator Run Period is September 19 - December 22
- How about we generate a draft commissioning plan to understand tasks, requirements, goals?
4- General Info: ReadyTalk ends August 1st. Migrating to Blue Jeans [1]
Notes from this meeting:
- Bubble Chamber: still looking for a solution to the nuclearations at the interface between mercury and the N2O.
- Tried CO2 but the problem got worse
- Tried C4F10 as an intermediate buffer fluid but it mixes with N2O
- Concluded that it is not a result of thermal hot spot on the surface of mercury
- Next:
- will try differential cooling of mercury
- Otherwise will have to design and build a chamber with no buffer fluid
- Beamline drawings submitted to machine shop and due back at the start of August. The installation is planned in August and to be completed by the end of August.
- Meekins will make the collimator from copper on site (i.e, we do not need the copper from Argonne).
- Argonne to provide a list of cables need to run the bubble chamber.
- Planning to measure the photon spectra using a germanium detector. Will check with the Detector Group and with RadCon to see if we can borrow one.