Difference between revisions of "Wednesday November 5, 2014"
Jump to navigation
Jump to search
Line 21: | Line 21: | ||
* Bubble Chamber: | * Bubble Chamber: | ||
− | # New glass cell | + | # New glass cell is fabricated and re-assembling of chamber has started |
+ | # There will be one spare cell | ||
+ | |||
+ | * Modeling effort: | ||
+ | # All drawings are in: M:\bubble\grames\JLAB_Released_Bubble_Drawings | ||
+ | # Study sensitivity of beam position on radiator with collimator included in geometry | ||
+ | |||
+ | * Bubble Chamber Beamline: | ||
+ | * Beamline is commissioned and all components are working fine | ||
+ | * Had 10 μA CW on radiator/dump | ||
+ | * For the time being, there is a 10 μA CW administrative limit on beam to Bubble Chamber beamline | ||
+ | * Next: measure beam energy and neutron background, if any |
Revision as of 10:14, 6 November 2014
We will meet in TL 2236 on Wednesday November 5 at 3:30 pm EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Agenda:
1- Bubble Chamber progress at Argonne: media:Hg_Chamber_5Nov2014.pdf
2- Summary of radiator optimization modeling efforts: media:radiator_summary.pdf
Notes from this meeting:
- Bubble Chamber:
- New glass cell is fabricated and re-assembling of chamber has started
- There will be one spare cell
- Modeling effort:
- All drawings are in: M:\bubble\grames\JLAB_Released_Bubble_Drawings
- Study sensitivity of beam position on radiator with collimator included in geometry
- Bubble Chamber Beamline:
- Beamline is commissioned and all components are working fine
- Had 10 μA CW on radiator/dump
- For the time being, there is a 10 μA CW administrative limit on beam to Bubble Chamber beamline
- Next: measure beam energy and neutron background, if any