Difference between revisions of "Development Period - February 9-10"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
Listed in order of suggested priority...
 
Listed in order of suggested priority...
  
;Re-measure emittance in order to analyze Run 1 conditions (3 hours)
+
#Re-measure emittance in order to analyze Run 1 conditions (3 hours)
:* Note laser spot sizes have been reduced by about 2
+
* Note laser spot sizes have been reduced by about 2
:* Laser RF has been located closer to laser chassis
+
* Laser RF has been located closer to laser chassis
:* Laser chassis now has internal cooling
+
* Laser chassis now has internal cooling
  
;Test hardware TOF veto at 31MHz and 62MHz (6 hours)
+
#Test hardware TOF veto at 31MHz and 62MHz (6 hours)
  
;Test FADC without TDC (2 hours)
+
#Test FADC without TDC (2 hours)
  
;Test background as a function of target ladder position on large target foil (2 hours)
+
#Test background as a function of target ladder position on large target foil (2 hours)
  
;Test FADC delayed operation (2 hours)
+
#Test FADC delayed operation (2 hours)

Revision as of 11:21, 4 February 2015

Listed in order of suggested priority...

  1. Re-measure emittance in order to analyze Run 1 conditions (3 hours)
  • Note laser spot sizes have been reduced by about 2
  • Laser RF has been located closer to laser chassis
  • Laser chassis now has internal cooling
  1. Test hardware TOF veto at 31MHz and 62MHz (6 hours)
  1. Test FADC without TDC (2 hours)
  1. Test background as a function of target ladder position on large target foil (2 hours)
  1. Test FADC delayed operation (2 hours)