Difference between revisions of "Development Period - February 9-10"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
Listed in order of suggested priority... | Listed in order of suggested priority... | ||
− | + | Re-measure emittance in order to analyze Run 1 conditions (3 hours) | |
* Note laser spot sizes have been reduced by about 2 | * Note laser spot sizes have been reduced by about 2 | ||
* Laser RF has been located closer to laser chassis | * Laser RF has been located closer to laser chassis | ||
* Laser chassis now has internal cooling | * Laser chassis now has internal cooling | ||
− | + | Test hardware TOF veto at 31MHz and 62MHz (6 hours) | |
− | + | Test FADC without TDC (2 hours) | |
− | + | Test background as a function of target ladder position on large target foil (2 hours) | |
− | + | Test FADC delayed operation (2 hours) |
Revision as of 11:22, 4 February 2015
Listed in order of suggested priority...
Re-measure emittance in order to analyze Run 1 conditions (3 hours)
- Note laser spot sizes have been reduced by about 2
- Laser RF has been located closer to laser chassis
- Laser chassis now has internal cooling
Test hardware TOF veto at 31MHz and 62MHz (6 hours)
Test FADC without TDC (2 hours)
Test background as a function of target ladder position on large target foil (2 hours)
Test FADC delayed operation (2 hours)