Difference between revisions of "Development Period - February 9-10"

From Ciswikidb
Jump to navigation Jump to search
Line 3: Line 3:
 
#Re-measure emittance in order to analyze Run 1 conditions (3 hours)
 
#Re-measure emittance in order to analyze Run 1 conditions (3 hours)
 
#Test hardware TOF veto at 31MHz and 62MHz (6 hours)
 
#Test hardware TOF veto at 31MHz and 62MHz (6 hours)
#Test FADC without TDC (2 hours)
+
#Test FADC without TDC (2 hours). February 4, 2015: Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
 
#Test background as a function of target ladder position on large target foil (2 hours)
 
#Test background as a function of target ladder position on large target foil (2 hours)
 
#Test FADC delayed operation (2 hours)
 
#Test FADC delayed operation (2 hours)

Revision as of 17:31, 4 February 2015

Listed in order of suggested priority...

  1. Re-measure emittance in order to analyze Run 1 conditions (3 hours)
  2. Test hardware TOF veto at 31MHz and 62MHz (6 hours)
  3. Test FADC without TDC (2 hours). February 4, 2015: Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
  4. Test background as a function of target ladder position on large target foil (2 hours)
  5. Test FADC delayed operation (2 hours)