#Test FADC without TDC (2 hours). '''February 4, 2015:''' Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9. | #Test FADC without TDC (2 hours). '''February 4, 2015:''' Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9. | ||
#Test background as a function of target ladder position on large target foil (2 hours) | #Test background as a function of target ladder position on large target foil (2 hours) | ||
− | #Test | + | #Test Mott delayed operation (1 hours): a set of 10 runs while changing between No Delay and Delay=8. |
Revision as of 18:33, 8 February 2015
Listed in order of suggested priority...
- Re-measure emittance in order to analyze Run 1 conditions (3 hours)
- Test hardware TOF veto at 31MHz and 62MHz (6 hours)
- Test FADC without TDC (2 hours). February 4, 2015: Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
- Test background as a function of target ladder position on large target foil (2 hours)
- Test Mott delayed operation (1 hours): a set of 10 runs while changing between No Delay and Delay=8.