Line 3: | Line 3: | ||
#Re-measure emittance in order to analyze Run 1 conditions (3 hours) | #Re-measure emittance in order to analyze Run 1 conditions (3 hours) | ||
#Test hardware TOF veto at 31MHz and 62MHz (6 hours) | #Test hardware TOF veto at 31MHz and 62MHz (6 hours) | ||
− | #Test FADC without TDC ( | + | #Test FADC without TDC (1 hour). '''February 4, 2015:''' Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9. |
#Test background as a function of target ladder position on large target foil (2 hours) | #Test background as a function of target ladder position on large target foil (2 hours) | ||
− | #Test Mott delayed operation (1 | + | #Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8. |
Revision as of 14:31, 9 February 2015
Listed in order of suggested priority...
- Re-measure emittance in order to analyze Run 1 conditions (3 hours)
- Test hardware TOF veto at 31MHz and 62MHz (6 hours)
- Test FADC without TDC (1 hour). February 4, 2015: Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
- Test background as a function of target ladder position on large target foil (2 hours)
- Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8.