Difference between revisions of "Development Period - February 9-10"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
#Test background as a function of target ladder position on large target foil (2 hours) | #Test background as a function of target ladder position on large target foil (2 hours) | ||
#Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8. | #Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8. | ||
− | #Test new Mott DAQ Configurations (1 hour): SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50) with 5 uA on 1 um gold foil. | + | #Test new Mott DAQ Configurations (1 hour): SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil. |
Revision as of 16:08, 9 February 2015
Listed in order of suggested priority...
- Re-measure emittance in order to analyze Run 1 conditions (3 hours)
- Test hardware TOF veto at 31MHz and 62MHz (6 hours)
- Test FADC without TDC (1 hour). February 4, 2015: Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
- Test background as a function of target ladder position on large target foil (2 hours)
- Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8.
- Test new Mott DAQ Configurations (1 hour): SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil.