Difference between revisions of "Development Period - February 9-10"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
;Re-measure emittance in order to analyze Run 1 conditions (3 hours) | ;Re-measure emittance in order to analyze Run 1 conditions (3 hours) | ||
− | :* Identified parameters and details for a procedure | + | :* '''February 4, 2015:''' |
− | :* Measured emittance and Twiss for 6.3 MeV/c setup | + | ::* Identified parameters and details for a procedure |
− | :* Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now | + | ::* Measured emittance and Twiss for 6.3 MeV/c setup |
+ | ::* Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now | ||
;Test hardware TOF veto at 31MHz and 62MHz (6 hours) | ;Test hardware TOF veto at 31MHz and 62MHz (6 hours) | ||
;Test FADC without TDC (1 hour). | ;Test FADC without TDC (1 hour). | ||
+ | |||
:* '''February 4, 2015:''' Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9. | :* '''February 4, 2015:''' Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9. | ||
Revision as of 18:00, 9 February 2015
Listed in order of suggested priority...
- Re-measure emittance in order to analyze Run 1 conditions (3 hours)
- February 4, 2015:
- Identified parameters and details for a procedure
- Measured emittance and Twiss for 6.3 MeV/c setup
- Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now
- Test hardware TOF veto at 31MHz and 62MHz (6 hours)
- Test FADC without TDC (1 hour).
- February 4, 2015: Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
- Test background as a function of target ladder position on large target foil (2 hours)
- Test Mott delayed operation (1 hour)
- a set of 10 runs while changing between No Delay and Delay=8.
- Test new Mott DAQ Configurations (1 hour)
- SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil.