Difference between revisions of "Development Period - February 9-10"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
==Re-measure emittance in order to analyze Run 1 conditions (3 hours)== | ==Re-measure emittance in order to analyze Run 1 conditions (3 hours)== | ||
− | :* '''February | + | :* '''February 9, 2015:''' |
::* Identified parameters and details for a procedure | ::* Identified parameters and details for a procedure | ||
::* Measured emittance and Twiss for 6.3 MeV/c setup | ::* Measured emittance and Twiss for 6.3 MeV/c setup | ||
::* Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now | ::* Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now | ||
− | ==Test hardware TOF veto at 31MHz | + | ==Test hardware TOF veto at 31MHz (4 hours)== |
+ | :* ''' Runs 8210 - 8217 with 0.25 um gold foil''' | ||
==Test FADC without TDC (1 hour)== | ==Test FADC without TDC (1 hour)== |
Revision as of 18:57, 9 February 2015
Listed in order of suggested priority...
Re-measure emittance in order to analyze Run 1 conditions (3 hours)
- February 9, 2015:
- Identified parameters and details for a procedure
- Measured emittance and Twiss for 6.3 MeV/c setup
- Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now
Test hardware TOF veto at 31MHz (4 hours)
- Runs 8210 - 8217 with 0.25 um gold foil
Test FADC without TDC (1 hour)
- February 4, 2015:
- Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
Test background as a function of target ladder position on large target foil (2 hours)
Test Mott delayed operation (1 hour): a set of 10 runs while changing between No Delay and Delay=8
Test new Mott DAQ Configurations (1 hour)
- SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil.