Line 32: Line 32:
 
# Started pressure system approval process
 
# Started pressure system approval process
 
# Will need Electrical Review since we have 208 V custom-made electrical distribution box
 
# Will need Electrical Review since we have 208 V custom-made electrical distribution box
 +
# Need a TOSP with all the operational and safety procedures (fire, ...)
 +
# List of fluids:
 +
## Mercury: 150 mL
 +
## Superheated liquid: 40 – 60 ML
 +
## Hydrolic Oil: 5 gl
 +
## Silicon fluid for Chiller: 2 L

Revision as of 11:55, 5 July 2015

We will meet in TL 2221 on Wednesday July 1 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Bubble Chamber progress at Argonne




Notes from this meeting:


  • Bubble Chamber:
  1. Made the 27" stand for JLab Injector beamline
  2. Ready to start crating, expect to ship by mid-July
  3. Upon arrival at JLab, move to Injector tunnel
  4. Brad will provide description of the shipment and handling instruction
  5. Brad will be at JLab August 3 – 12.
  • Cancelled shifts of beam scheduled for August except for swing shifts in second week
  • Safety Reviews:
  1. Started pressure system approval process
  2. Will need Electrical Review since we have 208 V custom-made electrical distribution box
  3. Need a TOSP with all the operational and safety procedures (fire, ...)
  4. List of fluids:
    1. Mercury: 150 mL
    2. Superheated liquid: 40 – 60 ML
    3. Hydrolic Oil: 5 gl
    4. Silicon fluid for Chiller: 2 L