Difference between revisions of "Bubble Chamber Meeting Wednesday July 1, 2015"

From Ciswikidb
Jump to navigation Jump to search
Line 34: Line 34:
 
# List of fluids:
 
# List of fluids:
 
## Mercury: 150 mL
 
## Mercury: 150 mL
## Superheated liquid: 40 – 60 ML
+
## Superheated liquid (N<sub>2</sub>O or C<sub>3</sub>F<sub>8</sub>): 40 – 60 ML
## Hydrolic Oil: 5 gl
+
## Hydraulic fluid: 5 gl
 
## Silicon fluid for Chiller: 2 L
 
## Silicon fluid for Chiller: 2 L
  
  
 
* Cancelled shifts of beam scheduled for August except for swing shifts in second week
 
* Cancelled shifts of beam scheduled for August except for swing shifts in second week

Revision as of 11:59, 5 July 2015

We will meet in TL 2221 on Wednesday July 1 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Bubble Chamber progress at Argonne




Notes from this meeting:


  • Bubble Chamber:
  1. Made the 27" stand for JLab Injector beamline
  2. Ready to start crating, expect to ship by mid-July
  3. Upon arrival at JLab, move to Injector tunnel
  4. Brad will provide description of the shipment and handling instruction
  5. Brad will be at JLab August 3 – 12.


  • Safety Reviews:
  1. Started pressure system approval process
  2. Will need Electrical Review since we have 208 V custom-made electrical distribution box
  3. Need a TOSP with all the operational and safety procedures (fire, ...)
  4. List of fluids:
    1. Mercury: 150 mL
    2. Superheated liquid (N2O or C3F8): 40 – 60 ML
    3. Hydraulic fluid: 5 gl
    4. Silicon fluid for Chiller: 2 L


  • Cancelled shifts of beam scheduled for August except for swing shifts in second week