Difference between revisions of "PQB Meeting October 8, 2015"

From Ciswikidb
Jump to navigation Jump to search
Line 21: Line 21:
  
 
* The earliest for beam in Hall A is November 16.
 
* The earliest for beam in Hall A is November 16.
* Bob Michaels et al.: Very good progress with Hall parity DAQ and analysis and start working on Injector parity DAQ.
+
* Bob Michaels et al.: very good progress with Hall parity DAQ and analysis and start working on Injector parity DAQ.
 
* Helicity board can go up to 2.5 kHz reversal. No heating problem for the Pockels Cell HV optical switch.
 
* Helicity board can go up to 2.5 kHz reversal. No heating problem for the Pockels Cell HV optical switch.
 
* Hall A Progress Report:
 
* Hall A Progress Report:
## Hall C double raster installed in Hall A
+
# Hall C double raster installed in Hall A
## Cables for cavities all run from rack to Counting House
+
# Cables for cavities all run from rack to Counting House
## Still waiting on cavity receivers from John Musson
+
# Still waiting on cavity receivers from John Musson
## Signal cables from halo monitors ready and available in Counting House and HV cables connected to supply
+
# Signal cables from halo monitors ready and available in Counting House and HV cables connected to supply
## Waiting on halo detectors and target (fork) to arrive from Virginia Tech
+
# Waiting on halo detectors and target (fork) to arrive from Virginia Tech
## Plan to install halo target along with Harp work - waiting on halo target to start
+
# Plan to install halo target before Harp work
 +
# Halo signals are readout in scalers and should be written to EPICS channels for MCC to use
 +
# Reinstate the EPICS readout of halo rates
 +
# Halo detectors may not have shielding this fall
 +
# For lumi, there maybe a need for a thick solid carbon target

Revision as of 07:43, 9 October 2015

We will meet in TL 2236 Thursday October 8 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

  1. Ed Folts: Hall A beamline progress report
    1. Work update (September 21, 2015): media:Parity_beam_line_work_9-21_update.pdf media:Parity_beam_line_work_9-21_update.docx
  2. Kent Paschke: Hall A Fall Beam Tests: media:NovemberPQBStudies.pdf




Notes from this meeting:

  • The earliest for beam in Hall A is November 16.
  • Bob Michaels et al.: very good progress with Hall parity DAQ and analysis and start working on Injector parity DAQ.
  • Helicity board can go up to 2.5 kHz reversal. No heating problem for the Pockels Cell HV optical switch.
  • Hall A Progress Report:
  1. Hall C double raster installed in Hall A
  2. Cables for cavities all run from rack to Counting House
  3. Still waiting on cavity receivers from John Musson
  4. Signal cables from halo monitors ready and available in Counting House and HV cables connected to supply
  5. Waiting on halo detectors and target (fork) to arrive from Virginia Tech
  6. Plan to install halo target before Harp work
  7. Halo signals are readout in scalers and should be written to EPICS channels for MCC to use
  8. Reinstate the EPICS readout of halo rates
  9. Halo detectors may not have shielding this fall
  10. For lumi, there maybe a need for a thick solid carbon target