Difference between revisions of "PQB Meeting November 5, 2015"

From Ciswikidb
Jump to navigation Jump to search
Line 24: Line 24:
 
## Will break vacuum to take pictures of QWeak halo target.
 
## Will break vacuum to take pictures of QWeak halo target.
 
## May have to move a girder to free space for Moller polarimeter target (Y. Roblin imported those changes in model and everything is fine).
 
## May have to move a girder to free space for Moller polarimeter target (Y. Roblin imported those changes in model and everything is fine).
 +
# Kent's list of topics: [[media:NovemberPQBStudies_Nov5Upd.pdf]]

Revision as of 12:57, 5 November 2015

We will meet in TL 2236 Thursday November 5 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

  1. Beam Schedule:
    1. Injector: a lot of opportunities
    2. Accelerator: Nov 9, 2015 – Dec 21
    3. Beam to Hall A: Dec 6 – Dec 21
      1. 900 kW push to Hall-A
      2. 5-pass 11 GeV Mott vs Moeller/Compton: spin dance
      3. 1-pass 2.2 GeV Mott vs Moeller/Compton: spin dance
    4. Accelerator: Jan 28, 2016 – April 14
  2. B. Michaels – Parity DAQs:
    1. Parity DAQ in hall is basically ready.
    2. DAQ at injector is working but Rakitha was going to make some changes to data format to make it easier on our analysis package.
  3. QWeak halo target was installed in Hall A. New optimized halo target will be installed in 2016.
  4. Ed Folts – Hall A beamline progress report:
    1. Will break vacuum to take pictures of QWeak halo target.
    2. May have to move a girder to free space for Moller polarimeter target (Y. Roblin imported those changes in model and everything is fine).
  5. Kent's list of topics: media:NovemberPQBStudies_Nov5Upd.pdf