Difference between revisions of "PQB Meeting November 5, 2015"
Jump to navigation
Jump to search
(24 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
'''Agenda:''' | '''Agenda:''' | ||
− | # Schedule: | + | # Beam Schedule: |
− | ## Accelerator: Nov 9 | + | ## Injector: a lot of opportunities |
− | ## Beam to Hall A: Dec | + | ## Accelerator: Nov 9, 2015 – Dec 21 |
− | ### | + | ## Beam to Hall A: Dec 6 – Dec 21 |
− | ### 5-pass 11 GeV Mott vs Moeller/Compton: spin dance | + | ### 900 kW (11 GeV, 80 µA) push to Hall-A |
− | ### 1-pass 2.2 GeV Mott vs Moeller/Compton: spin dance | + | ### 5-pass 11 GeV Mott vs Moeller/Compton: spin dance (to study spin-precession in presence of synchrotron radiation) |
− | ## Accelerator: Jan 28 | + | ### 1-pass 2.2 GeV Mott vs Moeller/Compton: spin dance (to study spin-precession with no synchrotron radiation) |
− | # Ed Folts | + | ## Accelerator: Jan 28, 2016 – April 14 |
+ | # B. Michaels – Parity DAQs: | ||
+ | ## Parity DAQ in hall (Counting House + Right Spectrometer) is basically ready. | ||
+ | ## DAQ at injector is working but Rakitha was going to make some changes to data format to make it easier on our analysis package. | ||
+ | ## Errors from helicity prediction algorithm may be related to flipping an ECL cable | ||
+ | # QWeak halo target was installed in Hall A. New optimized halo target will be installed in 2016. | ||
+ | # Ed Folts – Hall A beamline progress report: | ||
+ | ## Will break vacuum to take pictures of QWeak halo target. | ||
+ | ## May have to move a girder to free space for Moller polarimeter target (Y. Roblin imported those changes in model and everything is fine). | ||
+ | # Kent's list of topics: [[media:NovemberPQBStudies_Nov5Upd.pdf]] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | '''Notes from this meeting:''' | ||
+ | |||
+ | * No reason to break the vacuum to just take a picture of the target, unless the condition of the target is uncertain. | ||
+ | * Halo target controls are connected and have been tested. |
Latest revision as of 09:13, 13 November 2015
We will meet in TL 2236 Thursday November 5 at 1:00 pm EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Agenda:
- Beam Schedule:
- Injector: a lot of opportunities
- Accelerator: Nov 9, 2015 – Dec 21
- Beam to Hall A: Dec 6 – Dec 21
- 900 kW (11 GeV, 80 µA) push to Hall-A
- 5-pass 11 GeV Mott vs Moeller/Compton: spin dance (to study spin-precession in presence of synchrotron radiation)
- 1-pass 2.2 GeV Mott vs Moeller/Compton: spin dance (to study spin-precession with no synchrotron radiation)
- Accelerator: Jan 28, 2016 – April 14
- B. Michaels – Parity DAQs:
- Parity DAQ in hall (Counting House + Right Spectrometer) is basically ready.
- DAQ at injector is working but Rakitha was going to make some changes to data format to make it easier on our analysis package.
- Errors from helicity prediction algorithm may be related to flipping an ECL cable
- QWeak halo target was installed in Hall A. New optimized halo target will be installed in 2016.
- Ed Folts – Hall A beamline progress report:
- Will break vacuum to take pictures of QWeak halo target.
- May have to move a girder to free space for Moller polarimeter target (Y. Roblin imported those changes in model and everything is fine).
- Kent's list of topics: media:NovemberPQBStudies_Nov5Upd.pdf
Notes from this meeting:
- No reason to break the vacuum to just take a picture of the target, unless the condition of the target is uncertain.
- Halo target controls are connected and have been tested.