Difference between revisions of "PQB Meeting November 5, 2015"

From Ciswikidb
Jump to navigation Jump to search
 
(15 intermediate revisions by the same user not shown)
Line 10: Line 10:
  
 
# Beam Schedule:
 
# Beam Schedule:
 +
## Injector: a lot of opportunities
 
## Accelerator: Nov 9, 2015 – Dec 21
 
## Accelerator: Nov 9, 2015 – Dec 21
## Beam to Hall A: Dec 14 – Dec 21
+
## Beam to Hall A: Dec 6 – Dec 21
### 900 kW push to Hall-A
+
### 900 kW (11 GeV, 80 µA) push to Hall-A
### 5-pass 11 GeV Mott vs Moeller/Compton: spin dance
+
### 5-pass 11 GeV Mott vs Moeller/Compton: spin dance (to study spin-precession in presence of synchrotron radiation)
### 1-pass 2.2 GeV Mott vs Moeller/Compton: spin dance
+
### 1-pass 2.2 GeV Mott vs Moeller/Compton: spin dance (to study spin-precession with no synchrotron radiation)
 
## Accelerator: Jan 28, 2016 – April 14
 
## Accelerator: Jan 28, 2016 – April 14
 
# B. Michaels – Parity DAQs:
 
# B. Michaels – Parity DAQs:
## Parity DAQ in the hall is basically ready.
+
## Parity DAQ in hall (Counting House + Right Spectrometer) is basically ready.
## DAQ at the injector is working but Rakitha was going to make some changes to the data format to make it easier on our analysis package.  
+
## DAQ at injector is working but Rakitha was going to make some changes to data format to make it easier on our analysis package.
 +
## Errors from helicity prediction algorithm may be related to flipping an ECL cable
 +
# QWeak halo target was installed in Hall A. New optimized halo target will be installed in 2016.
 
# Ed Folts – Hall A beamline progress report:
 
# Ed Folts – Hall A beamline progress report:
 +
## Will break vacuum to take pictures of QWeak halo target.
 +
## May have to move a girder to free space for Moller polarimeter target (Y. Roblin imported those changes in model and everything is fine).
 +
# Kent's list of topics: [[media:NovemberPQBStudies_Nov5Upd.pdf]]
 +
 +
 +
 +
 +
----
 +
 +
'''Notes from this meeting:'''
 +
 +
* No reason to break the vacuum to just take a picture of the target, unless the condition of the target is uncertain.
 +
* Halo target controls are connected and have been tested.

Latest revision as of 09:13, 13 November 2015

We will meet in TL 2236 Thursday November 5 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

  1. Beam Schedule:
    1. Injector: a lot of opportunities
    2. Accelerator: Nov 9, 2015 – Dec 21
    3. Beam to Hall A: Dec 6 – Dec 21
      1. 900 kW (11 GeV, 80 µA) push to Hall-A
      2. 5-pass 11 GeV Mott vs Moeller/Compton: spin dance (to study spin-precession in presence of synchrotron radiation)
      3. 1-pass 2.2 GeV Mott vs Moeller/Compton: spin dance (to study spin-precession with no synchrotron radiation)
    4. Accelerator: Jan 28, 2016 – April 14
  2. B. Michaels – Parity DAQs:
    1. Parity DAQ in hall (Counting House + Right Spectrometer) is basically ready.
    2. DAQ at injector is working but Rakitha was going to make some changes to data format to make it easier on our analysis package.
    3. Errors from helicity prediction algorithm may be related to flipping an ECL cable
  3. QWeak halo target was installed in Hall A. New optimized halo target will be installed in 2016.
  4. Ed Folts – Hall A beamline progress report:
    1. Will break vacuum to take pictures of QWeak halo target.
    2. May have to move a girder to free space for Moller polarimeter target (Y. Roblin imported those changes in model and everything is fine).
  5. Kent's list of topics: media:NovemberPQBStudies_Nov5Upd.pdf




Notes from this meeting:

  • No reason to break the vacuum to just take a picture of the target, unless the condition of the target is uncertain.
  • Halo target controls are connected and have been tested.