Difference between revisions of "PQB Meeting December 10, 2015"

From Ciswikidb
Jump to navigation Jump to search
Line 9: Line 9:
 
'''Agenda:'''  
 
'''Agenda:'''  
 
# Beam Schedule:
 
# Beam Schedule:
## Monday Dec 7 during Day: Tune beam delivered to Hall A dumplet at 11 GeV
+
## Monday Dec 7 during Day: Tune beam delivered to Hall A dumplet in Beam Switch Yard (BSY) at 11 GeV
 
## Tuesday Dec 8 at 3:00 pm: Hall A closes  
 
## Tuesday Dec 8 at 3:00 pm: Hall A closes  
 
## Wednesday Dec 9 – Friday Dec 11: CW beam to Hall A dump (including a full eight-hour run at 80 µA (900 kW))
 
## Wednesday Dec 9 – Friday Dec 11: CW beam to Hall A dump (including a full eight-hour run at 80 µA (900 kW))
Line 16: Line 16:
 
## Friday Dec 18 – Saturday Dec 19: 5-pass 11 GeV Mott vs Moeller/Compton (spin dance to study spin-precession in presence of synchrotron radiation)
 
## Friday Dec 18 – Saturday Dec 19: 5-pass 11 GeV Mott vs Moeller/Compton (spin dance to study spin-precession in presence of synchrotron radiation)
 
## Saturday Dec 19 – Sunday Dec 20: 1-pass 2.2 GeV Mott vs Moeller/Compton (spin dance to study spin-precession with no synchrotron radiation)
 
## Saturday Dec 19 – Sunday Dec 20: 1-pass 2.2 GeV Mott vs Moeller/Compton (spin dance to study spin-precession with no synchrotron radiation)
# Ed Folts – Hall A beamline progress report
 

Revision as of 16:46, 8 December 2015

We will meet in TL 2236 Thursday December 10 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

  1. Beam Schedule:
    1. Monday Dec 7 during Day: Tune beam delivered to Hall A dumplet in Beam Switch Yard (BSY) at 11 GeV
    2. Tuesday Dec 8 at 3:00 pm: Hall A closes
    3. Wednesday Dec 9 – Friday Dec 11: CW beam to Hall A dump (including a full eight-hour run at 80 µA (900 kW))
    4. Friday Dec 11 during day: Start Hall D setup
    5. Friday Dec 11 – Monday Dec 21: many opportunities of beam to Hall A dump (including a full eight-hour run at 80 µA to Hall A and 5 µA to Hall D)
    6. Friday Dec 18 – Saturday Dec 19: 5-pass 11 GeV Mott vs Moeller/Compton (spin dance to study spin-precession in presence of synchrotron radiation)
    7. Saturday Dec 19 – Sunday Dec 20: 1-pass 2.2 GeV Mott vs Moeller/Compton (spin dance to study spin-precession with no synchrotron radiation)