+ | * Laser | ||
+ | ** Shukui is making great progress with the laser transport system | ||
+ | ** The LPSS has been certified by SSG | ||
* Magnets | * Magnets | ||
Line 14: | Line 18: | ||
** Functional. They are the point where they need the EPICS screen interface to drive them in/out. | ** Functional. They are the point where they need the EPICS screen interface to drive them in/out. | ||
** Joe Gubeli, Chris Gould and K. Jordan are working on the cameras. | ** Joe Gubeli, Chris Gould and K. Jordan are working on the cameras. | ||
+ | |||
+ | * Vacuum | ||
+ | ** All ion pumps connected to UHV supplies. | ||
+ | ** Each pump cable has been labeled thanks to John for providing resistive load. | ||
*Dump | *Dump |
Revision as of 12:15, 26 April 2016
- Mamun made the first multi-alkali photocathode in the GTS!
- Laser
- Shukui is making great progress with the laser transport system
- The LPSS has been certified by SSG
- Magnets
- The correctors have been installed int he beam line
- Software (G. Croke) has provided controls for running the GTS in rack FL05B10, [1]
- Viewers
- Functional. They are the point where they need the EPICS screen interface to drive them in/out.
- Joe Gubeli, Chris Gould and K. Jordan are working on the cameras.
- Vacuum
- All ion pumps connected to UHV supplies.
- Each pump cable has been labeled thanks to John for providing resistive load.
- Dump
- Electrically isolated
- Lead shield 'case' is now in the GTS. Will bring Vashek to check it out.
- Shukui lent us a chiller, still needs to be connected