Difference between revisions of "UITF Meeting - January 29, 2018"
Jump to navigation
Jump to search
(5 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
------ | ------ | ||
− | |||
[https://logbooks.jlab.org/entry/3521527 200keV Beam to both UITF dumps!] | [https://logbooks.jlab.org/entry/3521527 200keV Beam to both UITF dumps!] | ||
− | |||
------ | ------ | ||
+ | UITF Schedule - Zimbra calendar resource now functional. Add uitf-schedule to your zimbra calendar to see cae lock-up dates/times, etc. | ||
+ | ------ | ||
+ | UPDATES | ||
− | + | *Choppers are being conditioned by Mark and Larry. Thanks! | |
+ | ** What is status of 1X/1Y and 2X/2Y? | ||
+ | **When do you estimate to complete conditioning for 200 keV beam (75 Watts RF power on choppers), '''at least 1X/2X''' | ||
+ | **We'll need screens/guidance to operate choppers - how's that going? | ||
− | + | *Magnets: | |
− | + | **[https://logbooks.jlab.org/entry/3521494 Address PS rack ITF03 which prevents using four magnets presently] | |
+ | **Need to add one more corrector pair between the gun and the solenoid | ||
+ | **EPICS magnet screen is complete and functional with field maps provided by Joe | ||
+ | **Insulate and strain relieve the two FD chopper solenoids (they're off now, M. Beck is working on it) | ||
− | + | *Valves | |
+ | **When will the two MDC valves have status read back? | ||
− | + | *FSD | |
− | + | **Performed software functionality test in UITF control room last week. | |
+ | **What else is needed for full functionality? | ||
− | |||
− | |||
− | BPMs | + | *BPMs |
− | Cables installed and terminated. | + | **Cables installed and terminated. |
− | Status on hardware, firmware, and EPICS software? | + | **Status on hardware, firmware, and EPICS software? |
+ | ** We need them operational and reading in EPICS before running beam in Tune Mode | ||
− | CRYO | + | *CRYO |
− | From last meeting: Cool down transfer line and 1/4 cryo-module to 80 K. | + | **From last meeting: Cool down transfer line and 1/4 cryo-module to 80 K. |
− | + | **Estimated time to complete? | |
+ | ** Update: D. Bullard completed installation of guard vacuum relief vent outside the cave | ||
+ | ** UPDATES: cryogenic connections? | ||
− | RF | + | *RF |
− | Update on RF for Quarter Cryo Module? | + | **Update on RF for Quarter Cryo Module? |
− | Estimate time to complete? | + | **Estimate time to complete? |
+ | ** UPDATES: Klystron connections? | ||
Latest revision as of 09:42, 29 January 2018
200keV Beam to both UITF dumps!
UITF Schedule - Zimbra calendar resource now functional. Add uitf-schedule to your zimbra calendar to see cae lock-up dates/times, etc.
UPDATES
- Choppers are being conditioned by Mark and Larry. Thanks!
- What is status of 1X/1Y and 2X/2Y?
- When do you estimate to complete conditioning for 200 keV beam (75 Watts RF power on choppers), at least 1X/2X
- We'll need screens/guidance to operate choppers - how's that going?
- Magnets:
- Address PS rack ITF03 which prevents using four magnets presently
- Need to add one more corrector pair between the gun and the solenoid
- EPICS magnet screen is complete and functional with field maps provided by Joe
- Insulate and strain relieve the two FD chopper solenoids (they're off now, M. Beck is working on it)
- Valves
- When will the two MDC valves have status read back?
- FSD
- Performed software functionality test in UITF control room last week.
- What else is needed for full functionality?
- BPMs
- Cables installed and terminated.
- Status on hardware, firmware, and EPICS software?
- We need them operational and reading in EPICS before running beam in Tune Mode
- CRYO
- From last meeting: Cool down transfer line and 1/4 cryo-module to 80 K.
- Estimated time to complete?
- Update: D. Bullard completed installation of guard vacuum relief vent outside the cave
- UPDATES: cryogenic connections?
- RF
- Update on RF for Quarter Cryo Module?
- Estimate time to complete?
- UPDATES: Klystron connections?
Epics screens
Working with T. Larrieu and team on SAVE/RESTORE.
Matt is working on OSP for buncher and choppers
By February 5, 2018:
All cryo work complete All High Power RF work complete OSP for QCM approved ODH assessment, vent can on relief stack, penetrations filled, etc,