Difference between revisions of "GTS meeting 6 18 18"

From Ciswikidb
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 4: Line 4:
  
 
* Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
 
* Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
# 30 minutes Sb deposition (completed)
+
# 30 minutes Sb deposition (heat cleaning again before second attempt, puck was too hot during activation)
# 60 minutes Sb deposition (heat cleaning before second attempt, puck was too hot)
+
# 60 minutes Sb deposition (heat cleaned, to be activated today)
 
# 90 minutes Sb deposition (completed)
 
# 90 minutes Sb deposition (completed)
 +
# 10 minutes Sb deposition (done, presented in IPAC'18)
  
  
 
* CST microwave studio simulations of 300 kV GTS gun: [[media:Gabriel_GTS_CST_18June2018.pdf]]
 
* CST microwave studio simulations of 300 kV GTS gun: [[media:Gabriel_GTS_CST_18June2018.pdf]]

Latest revision as of 06:37, 25 June 2018

  • GTS updated plan [1]
- Beamline magnets when Gun Solenoid at 400 Amps [2]


  • Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
  1. 30 minutes Sb deposition (heat cleaning again before second attempt, puck was too hot during activation)
  2. 60 minutes Sb deposition (heat cleaned, to be activated today)
  3. 90 minutes Sb deposition (completed)
  4. 10 minutes Sb deposition (done, presented in IPAC'18)