Difference between revisions of "Summer SAD 2019"
Jump to navigation
Jump to search
(4 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
;Pre-planning for Aug-Nov SAD 2019 | ;Pre-planning for Aug-Nov SAD 2019 | ||
*[[media:190501_GunUpgradeJobs.docx]] | *[[media:190501_GunUpgradeJobs.docx]] | ||
+ | *[[media:30July2019_KryptonLine.pptx]] | ||
*[[Gun2 Load Lock Chamber Replacement]] | *[[Gun2 Load Lock Chamber Replacement]] | ||
;SAD ATLIS tasks | ;SAD ATLIS tasks | ||
+ | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19541 Test large shed electrode optics] | ||
+ | *[http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1142 ATLIS to remove small shed from UITF and prep for CEBAF] | ||
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19462 Gun2 200kV cathode, 10kV anode, kr plumbing] | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19462 Gun2 200kV cathode, 10kV anode, kr plumbing] | ||
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19516 Pete's BPM Atlis] | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19516 Pete's BPM Atlis] | ||
Line 9: | Line 12: | ||
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19463 Upgrade the loading chamber] | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19463 Upgrade the loading chamber] | ||
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19465 Upgrade fiber laser connectors] | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19465 Upgrade fiber laser connectors] | ||
+ | ::[https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386979P req 1] | ||
+ | ::[https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=386983 req 2] | ||
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19480 Testing CEBAF w/ 200 keV beam] | *[http://devweb.acc.jlab.org/CSUEApps/atlis/task/19480 Testing CEBAF w/ 200 keV beam] | ||
;SAD Schedule and Beam Resstoration | ;SAD Schedule and Beam Resstoration | ||
* [https://accweb.acc.jlab.org/calendar/ SAD Calendar] | * [https://accweb.acc.jlab.org/calendar/ SAD Calendar] |
Latest revision as of 08:05, 12 August 2019
- Pre-planning for Aug-Nov SAD 2019
- media:190501_GunUpgradeJobs.docx
- media:30July2019_KryptonLine.pptx
- Gun2 Load Lock Chamber Replacement
- SAD ATLIS tasks
- Test large shed electrode optics
- ATLIS to remove small shed from UITF and prep for CEBAF
- Gun2 200kV cathode, 10kV anode, kr plumbing
- Pete's BPM Atlis
- CEBAF Kr Gas HV Conditioning
- Upgrade the loading chamber
- Upgrade fiber laser connectors
- SAD Schedule and Beam Resstoration