Difference between revisions of "Wednesday March 5, 2014"
Jump to navigation
Jump to search
(23 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
'''Agenda:''' | '''Agenda:''' | ||
− | 1- | + | 1- Bubble Chamber progress at Argonne |
− | 2- | + | 2- Bubble Chamber Schedule at JLab |
− | 3- Bubble Chamber | + | 3- How would the 5D beamline look for the Bubble Chamber beam test? |
+ | |||
− | |||
− | + | ---- | |
+ | |||
+ | '''Notes from this meeting:''' | ||
+ | |||
+ | * The new chiller did not arrive at Argonne yet. | ||
+ | |||
+ | * The Bubble Chamber safety reviews will be completed soon (Pressure System completed, waiting on Mercury Review) and a copy will be sent to JLab by the end of March to start the process here. | ||
+ | |||
+ | * Our Budget Request: [[media:Bubble_FinalCost.pdf]] [[media:Bubble_FinalCost.pptx]] | ||
+ | - Fast Vale and Dipole Magnet are approved as part of RSR/SRC. | ||
+ | - Other expenses (Super Harps, Dumps, ...) were included in the ARD/SRC request but not yet approved. | ||
+ | |||
+ | * Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble Chamber beamline, in the radiator chamber. | ||
+ | |||
+ | * Test Beamline: | ||
+ | - Ask for thermal analysis of the flange radiator to determine the operational beam current. | ||
+ | - Design collimator using GEANT4. Part of the collimator could be positioned inside the pressure vessel. At some point, | ||
+ | Argonne ordered Cu material that could be available for us. | ||
+ | |||
+ | * Test Schedule: | ||
+ | - Start the '''Experiment Readiness Review''' process with a meeting with Arne and Rolf. |
Latest revision as of 12:40, 28 March 2014
We will meet in TL 2236 on Wednesday March 5 at 3:00 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1- Bubble Chamber progress at Argonne
2- Bubble Chamber Schedule at JLab
3- How would the 5D beamline look for the Bubble Chamber beam test?
Notes from this meeting:
- The new chiller did not arrive at Argonne yet.
- The Bubble Chamber safety reviews will be completed soon (Pressure System completed, waiting on Mercury Review) and a copy will be sent to JLab by the end of March to start the process here.
- Our Budget Request: media:Bubble_FinalCost.pdf media:Bubble_FinalCost.pptx
- Fast Vale and Dipole Magnet are approved as part of RSR/SRC. - Other expenses (Super Harps, Dumps, ...) were included in the ARD/SRC request but not yet approved.
- Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble Chamber beamline, in the radiator chamber.
- Test Beamline:
- Ask for thermal analysis of the flange radiator to determine the operational beam current. - Design collimator using GEANT4. Part of the collimator could be positioned inside the pressure vessel. At some point, Argonne ordered Cu material that could be available for us.
- Test Schedule:
- Start the Experiment Readiness Review process with a meeting with Arne and Rolf.