==== <u>New items for discussion:</u> ==== | ==== <u>New items for discussion:</u> ==== | ||
* [[media:ERRCloseOutReport-UITFHRSDIrradiation.pdf|ERR Final Report]] & discussion - to include target FSD (Mike) | * [[media:ERRCloseOutReport-UITFHRSDIrradiation.pdf|ERR Final Report]] & discussion - to include target FSD (Mike) | ||
+ | *# FSD perhaps excessive, though recommended by ERR committee. McCaughan to follow up with them. Idea of software interlock [IF Target_Motion THEN BeamSynch] was also floated and looks worthwhile to pursue. Action item: McCaughan change request to Software group | ||
* [[media:WastewaterIrradiation_McCaughan_long SAD change request.docx|Change request]] submitted to SAD Coordination Task Force - awaiting evaluation. (Mike) | * [[media:WastewaterIrradiation_McCaughan_long SAD change request.docx|Change request]] submitted to SAD Coordination Task Force - awaiting evaluation. (Mike) | ||
+ | *#Once approved resource loaded schedule must be published internally for use | ||
* Beam Studies & Optics Characterization: Model development + Planned studies (John, Xi) | * Beam Studies & Optics Characterization: Model development + Planned studies (John, Xi) | ||
* Gun heat and reactivation required (Poelker) | * Gun heat and reactivation required (Poelker) | ||
* Engineering: BCM cabling completed, MQZ installed in Wien filter location for emittance studies, HDice line locked out and blanked off after FC#4. Other? | * Engineering: BCM cabling completed, MQZ installed in Wien filter location for emittance studies, HDice line locked out and blanked off after FC#4. Other? | ||
+ | *#Double check Slow bleed cart availability with SRF | ||
+ | *#Brock Cavity should be removed from present song sheet location on wastewater line as earlier decided. | ||
* Other business | * Other business | ||
+ | *#A formal run plan | ||
==== <u>Reports on Open Action Items:</u> ==== | ==== <u>Reports on Open Action Items:</u> ==== | ||
[[Meeting_minutes | Back to Main Meeting Minutes Page]] | [[Meeting_minutes | Back to Main Meeting Minutes Page]] |
Latest revision as of 10:43, 17 March 2021
Meeting Information
Connecting
To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
- To join via phone, use one of the following numbers and the Conference ID: 946721076.
- Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
Agenda
Schedule
Rough timetable:
- HDIce run2b completed (March 13)
- Beam studies until cryo transition to CMTF
- PSS Certification immediately afterwards
- CMTF tests with C75-1 (late-March - early-June). More refined CMTF schedule / testing duration?
- UITF beamline Modification in parallel to install new beamline
- Supplementary Shielding Installation: Mid-June
- Beamline Commissioning / Test Plans / Shielding Verification: Late June / Early July
- First commissioning of water irradiation beamline in ~July/August
Short term plan[2]
New items for discussion:
- ERR Final Report & discussion - to include target FSD (Mike)
- FSD perhaps excessive, though recommended by ERR committee. McCaughan to follow up with them. Idea of software interlock [IF Target_Motion THEN BeamSynch] was also floated and looks worthwhile to pursue. Action item: McCaughan change request to Software group
- Change request submitted to SAD Coordination Task Force - awaiting evaluation. (Mike)
- Once approved resource loaded schedule must be published internally for use
- Beam Studies & Optics Characterization: Model development + Planned studies (John, Xi)
- Gun heat and reactivation required (Poelker)
- Engineering: BCM cabling completed, MQZ installed in Wien filter location for emittance studies, HDice line locked out and blanked off after FC#4. Other?
- Double check Slow bleed cart availability with SRF
- Brock Cavity should be removed from present song sheet location on wastewater line as earlier decided.
- Other business
- A formal run plan