Difference between revisions of "Feb 2, 2022 - Group meeting"
Jump to navigation
Jump to search
(6 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
* On-site in TL-1227 | * On-site in TL-1227 | ||
* Zoom https://jlab-org.zoomgov.com/j/1619764149?pwd=dWpNeG9mWFdIOGdObXpNRnFvaWVhUT09 | * Zoom https://jlab-org.zoomgov.com/j/1619764149?pwd=dWpNeG9mWFdIOGdObXpNRnFvaWVhUT09 | ||
+ | |||
+ | ==Announcements== | ||
+ | * CIS job vacancies | ||
+ | * Hybrid work policy | ||
==CEBAF SAD [[Schedule Accelerator Down]]== | ==CEBAF SAD [[Schedule Accelerator Down]]== | ||
− | * Next two weeks | + | * Next two weeks |
** Feb 8-10 - install ML fiber laser, lock up Feb 11 for HCO (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22830) | ** Feb 8-10 - install ML fiber laser, lock up Feb 11 for HCO (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22830) | ||
− | ** Feb 14-20 - 12 shifts for beam studies | + | ** Feb 14-20 - 12 shifts for beam studies - (Daniel will organize meeting Tue Feb 8 in afternoon to discuss beam studies) |
− | *** Characterize ML laser (pulse length, bleed through, high current setup to fc#2) - (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22830) | + | *** Joe - Characterize ML laser (pulse length, bleed through, high current setup to fc#2) - (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22830) |
− | *** Characterize noise on Wien magnets 10 A trims vs. 20 A SCE (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/23781) | + | *** Riad - Characterize noise on Wien magnets 10 A trims vs. 20 A SCE (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/23781) |
− | *** Characterize gun kick vs. laser position and gun voltage? (NEEDS ATLIS) | + | *** Max - Characterize gun kick vs. laser position and gun voltage? (NEEDS ATLIS) |
− | + | * Feb 21 - Apr 28 | |
− | + | ** CIS - Decide if ML laser remains for next run, or backout to GS | |
− | + | ** CIS - Harp/A2 vacuum job (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/23934) => postponed to 2023 | |
− | + | ** CIS - Return Mott gold target ladder | |
− | + | ** CIS - Remove Compton transmission polarimeter magnet/detector & Bubble radiator | |
− | + | ** Install - Remove 5D beam line (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22161) | |
− | + | ** RF - upgrade LLRF 3.0 (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376) | |
− | ** Apr 26 - Jun 8 | + | ** FML - Install lights by QCM |
− | + | * Apr 26 - Jun 8 | |
+ | ** Prepare cathode - (https://logbooks.jlab.org/entry/3978347) | ||
+ | |||
+ | ==Updates from GTS & UITF== | ||
+ | *UITF | ||
+ | **Feb - SAD + Lifetime vs. Gun voltage (Max) | ||
+ | **Mar - Wrap up BS + Wien/Mott vacuum work | ||
+ | **Apr - Wrap up vacuum work + CsSbO2 lifetime (Mamun/Max) | ||
+ | **May - Wrap up lifetime + install 200 kV gun | ||
+ | **Jun - Wrap up gun install + commission gun 200 - 3?? kV | ||
+ | *GTS | ||
+ | ** Feb - | ||
+ | ** Mar - | ||
+ | ** Apr - | ||
+ | |||
+ | ==200 kV GUN== | ||
+ | * Injector Upgrade - https://wiki.jlab.org/ciswiki/index.php/CEBAF_Injector_Upgrade | ||
==Standing Links== | ==Standing Links== |
Latest revision as of 10:32, 2 February 2022
Meeting Coordinates
- On-site in TL-1227
- Zoom https://jlab-org.zoomgov.com/j/1619764149?pwd=dWpNeG9mWFdIOGdObXpNRnFvaWVhUT09
Announcements
- CIS job vacancies
- Hybrid work policy
CEBAF SAD Schedule Accelerator Down
- Next two weeks
- Feb 8-10 - install ML fiber laser, lock up Feb 11 for HCO (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22830)
- Feb 14-20 - 12 shifts for beam studies - (Daniel will organize meeting Tue Feb 8 in afternoon to discuss beam studies)
- Joe - Characterize ML laser (pulse length, bleed through, high current setup to fc#2) - (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22830)
- Riad - Characterize noise on Wien magnets 10 A trims vs. 20 A SCE (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/23781)
- Max - Characterize gun kick vs. laser position and gun voltage? (NEEDS ATLIS)
- Feb 21 - Apr 28
- CIS - Decide if ML laser remains for next run, or backout to GS
- CIS - Harp/A2 vacuum job (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/23934) => postponed to 2023
- CIS - Return Mott gold target ladder
- CIS - Remove Compton transmission polarimeter magnet/detector & Bubble radiator
- Install - Remove 5D beam line (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22161)
- RF - upgrade LLRF 3.0 (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376)
- FML - Install lights by QCM
- Apr 26 - Jun 8
- Prepare cathode - (https://logbooks.jlab.org/entry/3978347)
Updates from GTS & UITF
- UITF
- Feb - SAD + Lifetime vs. Gun voltage (Max)
- Mar - Wrap up BS + Wien/Mott vacuum work
- Apr - Wrap up vacuum work + CsSbO2 lifetime (Mamun/Max)
- May - Wrap up lifetime + install 200 kV gun
- Jun - Wrap up gun install + commission gun 200 - 3?? kV
- GTS
- Feb -
- Mar -
- Apr -
200 kV GUN
- Injector Upgrade - https://wiki.jlab.org/ciswiki/index.php/CEBAF_Injector_Upgrade
Standing Links
- Carlos' 18" gun page - https://wiki.jlab.org/ciswiki/index.php/18%22_Photogun_ala_GTS
- Winter 2022 SAD - https://wiki.jlab.org/ciswiki/index.php/Phase_2
- CIS Conference and Workshop Proceedings