Difference between revisions of "Meeting 6/29/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
6/29/22 Updates...
+
; Thursday's @ 9am EDT by Zoom
 +
* Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09
 +
* Zoom ID: 160 190 6056 and Passcode: 992019
 +
* Meeting wiki - https://wiki.jlab.org/ciswiki/index.php/Meeting_6/29/22_-_COMTRA
 +
 
 +
===6/30/22 Updates...===
  
 
;ME
 
;ME
Line 22: Line 27:
 
* Rest of DAQ (hardware and software) - how are we looking for UITF readiness ... Like = Aug 1, Should = Sep 1, Must = Oct 1  
 
* Rest of DAQ (hardware and software) - how are we looking for UITF readiness ... Like = Aug 1, Should = Sep 1, Must = Oct 1  
  
;What else?
+
;Documentation
 
* NIM paper - 6/29 created overleaf folder with Elsevier Article (elsarticle) template, will share after framing outline => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
 
* NIM paper - 6/29 created overleaf folder with Elsevier Article (elsarticle) template, will share after framing outline => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
 
* Portable Compton Polarimeter Manual - Still TBD, ideas how to outline this one?  Do in Overleaf too, or is a Sharepoint Word file better for drag/drop, everyone, etc?
 
* Portable Compton Polarimeter Manual - Still TBD, ideas how to outline this one?  Do in Overleaf too, or is a Sharepoint Word file better for drag/drop, everyone, etc?
 +
 +
;Greg's weekly meeting
 +
* Geant4 simulations - Joe/Eric/Riad ? and when ?

Latest revision as of 14:21, 29 June 2022

Thursday's @ 9am EDT by Zoom

6/30/22 Updates...

ME
  • Stands - Last week we said 'pull the trigger' on UITF stand (has been purchased?), later will order stand for BNL => Where is PR?
  • Collimator - Last week Riad provided drawing, found material but does not know if OHFC. Need (2) per this drawing. media:JL0015777_Cu_collimator.pdf What about ID hole???
  • Absorbers - Christine provided drawing 6/3, I forgot to act on this! Need (6) per this drawing => media:Absorber - 240 D 001 14_V4.pdf
Analyzing Magnet
Detector
  • BGO crystals - 6/28 - Arrived in Richmond, Deringer controls paperwork, 6/29 - DHL delivery due at JLab
  • PMT status - (4) Hamamatsu tubes w/ magnetic shield, PR 6/1, PO 6/2, due 8/2 or earlier => https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412467
  • PMT base status?
  • Detector box status?
DAQ
  • PMT-5R ItoV amplifier with remote control - 6/23 CC order placed to Advanced Instruments Corp, delivery date TBD
  • Rack- Last week? we discussed a rack layout showing all components + add/list odds/ends still needed UITF cables, connectors, patch panel, lifting bolts?, wheels?, can we finalize/order these
  • Rest of DAQ (hardware and software) - how are we looking for UITF readiness ... Like = Aug 1, Should = Sep 1, Must = Oct 1
Documentation
  • NIM paper - 6/29 created overleaf folder with Elsevier Article (elsarticle) template, will share after framing outline => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
  • Portable Compton Polarimeter Manual - Still TBD, ideas how to outline this one? Do in Overleaf too, or is a Sharepoint Word file better for drag/drop, everyone, etc?
Greg's weekly meeting
  • Geant4 simulations - Joe/Eric/Riad ? and when ?