Difference between revisions of "MOLLER PQB Meeting June 26, 2024"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
## Check S/H wiring of the Hall A BPMs in BSY | ## Check S/H wiring of the Hall A BPMs in BSY | ||
## Check FFB ON versus OFF in QWeak data | ## Check FFB ON versus OFF in QWeak data | ||
+ | |||
* '''Injector Upgrade Progress:''' | * '''Injector Upgrade Progress:''' | ||
Line 19: | Line 20: | ||
# Four out of six MFX solenoids are fixed | # Four out of six MFX solenoids are fixed | ||
− | * '''MOLLER rack | + | |
+ | * '''MOLLER needs new rack in ISB - IN03B25''' |
Latest revision as of 13:27, 29 June 2024
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
- Beam Study Results:
- FFB/FF in Hall A: media:2024April_FFBtest_Results.pdf
- Check S/H wiring of the Hall A BPMs in BSY
- Check FFB ON versus OFF in QWeak data
- Injector Upgrade Progress:
- Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
- No progress on Gun replacement
- Four out of six MFX solenoids are fixed
- MOLLER needs new rack in ISB - IN03B25