Difference between revisions of "MOLLER PQB Meeting December 11, 2024"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "In person in MCC Conference Room and with Zoom. https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam -- '''Agenda:''' * '''Fast Feedback Plans:''' first draft —...")
 
 
(17 intermediate revisions by the same user not shown)
Line 9: Line 9:
  
  
* '''Fast Feedback Plans:''' first draft — [[media:FastFeedback_Plans.pdf]]
+
* '''Injector Beam Studies:'''
 +
# Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
 +
# MOLLER DAQ tests to 1D at 65 µA: Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.  
  
  
* '''MOLLER AI/ML proposal:''' in collaboration with Halls B/D and David Lawrence as Lead PI
+
* '''MOLLER Beam Studies:''' Wien Flip Table — [[media:PQB_Wien_plans_Jan2025.xlsx]]
 +
 
 +
 
 +
* '''Fast Feedback Plans:''' [[media:FastFeedback_Plans.pdf]]  [[media:FastFeedback_Plans.docx]]

Latest revision as of 06:16, 17 December 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--


Agenda:


  • Injector Beam Studies:
  1. Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
  2. MOLLER DAQ tests to 1D at 65 µA: Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.