Difference between revisions of "MOLLER PQB Meeting December 11, 2024"
Jump to navigation
Jump to search
(16 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
− | * ''' | + | * '''Injector Beam Studies:''' |
+ | # Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled. | ||
+ | # MOLLER DAQ tests to 1D at 65 µA: Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc. | ||
− | * ''' | + | * '''MOLLER Beam Studies:''' Wien Flip Table — [[media:PQB_Wien_plans_Jan2025.xlsx]] |
− | * ''' | + | * '''Fast Feedback Plans:''' [[media:FastFeedback_Plans.pdf]] [[media:FastFeedback_Plans.docx]] |
Latest revision as of 06:16, 17 December 2024
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
- Injector Beam Studies:
- Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
- MOLLER DAQ tests to 1D at 65 µA: Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.
- MOLLER Beam Studies: Wien Flip Table — media:PQB_Wien_plans_Jan2025.xlsx
- Fast Feedback Plans: media:FastFeedback_Plans.pdf media:FastFeedback_Plans.docx