Difference between revisions of "Wednesday August 6, 2014"
Jump to navigation
Jump to search
(Created page with "We will meet in TL 2236 on Wednesday August 6 at 3:30 pm EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Ph...") |
|||
(8 intermediate revisions by 2 users not shown) | |||
Line 4: | Line 4: | ||
Phone number: 1-888-240-2560 | Phone number: 1-888-240-2560 | ||
Meeting ID: 3528502673# | Meeting ID: 3528502673# | ||
− | |||
Meeting URL: http://bluejeans.com/3528502673 | Meeting URL: http://bluejeans.com/3528502673 | ||
Line 11: | Line 10: | ||
1- Bubble Chamber progress at Argonne | 1- Bubble Chamber progress at Argonne | ||
+ | |||
+ | 2. (Grames) JLab Update | ||
+ | |||
+ | ; Design, installation and released mechanical drawings (dipole + beam line) are here \group\bubble\grames | ||
+ | * Songsheet and nomenclature [[media:ACC2008000-1100.pdf]] | ||
+ | |||
+ | ; Fabrication status | ||
+ | * [[media:140806_FabricationStatus.pdf]] | ||
+ | |||
+ | ; Installation status | ||
+ | * Injector power restored 2 days ago, can resume work | ||
+ | * Phil coordinating Alignment + Installation groups for new points & pedestals (in hand) | ||
+ | * Vacuum parts assembly will begin soon, tunnel installation date TBD | ||
+ | * Instrumentation hook-ups and cable pulls by ~Labor Day | ||
+ | * Fast valve controls group resolving design issue (no impact w/ thick radiator) | ||
+ | * Dipole magnet due mid-August (measurement and controls group ready); install depends on turn-around time | ||
+ | * Bench BPM position calibration (one done, one to go) | ||
+ | |||
+ | ; Commissioning status | ||
+ | * Provided punch list to Director of Ops (vacation until mid-August) | ||
+ | * High level goals are beam line functionality & 100uA at highest energy on radiator | ||
+ | * Contacted Medical Imaging group (Jay's suggestion) regarding Brem characterization | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | '''Notes from this meeting:''' | ||
+ | |||
+ | * Bubble Chamber: Next to try differentially cooled mercury (at meniscus, N<sub>2</sub>O will not be superheated). |
Latest revision as of 08:46, 16 September 2014
We will meet in TL 2236 on Wednesday August 6 at 3:30 pm EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Agenda:
1- Bubble Chamber progress at Argonne
2. (Grames) JLab Update
- Design, installation and released mechanical drawings (dipole + beam line) are here \group\bubble\grames
- Songsheet and nomenclature media:ACC2008000-1100.pdf
- Fabrication status
- Installation status
- Injector power restored 2 days ago, can resume work
- Phil coordinating Alignment + Installation groups for new points & pedestals (in hand)
- Vacuum parts assembly will begin soon, tunnel installation date TBD
- Instrumentation hook-ups and cable pulls by ~Labor Day
- Fast valve controls group resolving design issue (no impact w/ thick radiator)
- Dipole magnet due mid-August (measurement and controls group ready); install depends on turn-around time
- Bench BPM position calibration (one done, one to go)
- Commissioning status
- Provided punch list to Director of Ops (vacation until mid-August)
- High level goals are beam line functionality & 100uA at highest energy on radiator
- Contacted Medical Imaging group (Jay's suggestion) regarding Brem characterization
Notes from this meeting:
- Bubble Chamber: Next to try differentially cooled mercury (at meniscus, N2O will not be superheated).