Difference between revisions of "PQB Meeting June 4, 2015"

From Ciswikidb
Jump to navigation Jump to search
 
(14 intermediate revisions by the same user not shown)
Line 24: Line 24:
 
# Need to test Hall A BCMs.
 
# Need to test Hall A BCMs.
 
# Beam modulation coils were removed:
 
# Beam modulation coils were removed:
## Re-install. Yves will help identify the locations of the air core magnets on beamline
+
## Re-install. Yves will help identify location of the air core magnets on beamline
## Beam modulation and accelerator Fast Feedback: is there a need to turn off FFB when modulation is ON?
+
## Beam modulation and accelerator Fast Feedback: is there a need to pause FFB when modulation is ON? does FFB implement a digital notch filter to attenuate the modulation frequency while passing all other frequencies? (QWeak: 125 Hz for 20 s every 320 s). '''From Scott Higgins (July 14, 2015): Hall has paused FFB while beam modulation was on. FFB does not implement a digital notch filter to attenuate the mod freq'''.
# Install QQQ triplet in Hall A beamline.
+
 
 +
# Install QQQ cavity triplet in Hall A beamline.
 
# Install QWeak Halo Monitors in Hall A beamline (will need new halo target).
 
# Install QWeak Halo Monitors in Hall A beamline (will need new halo target).
 +
# Preparing a list of instrumentation of Hall A beamline for Thia.

Latest revision as of 14:40, 14 July 2015

We will meet in TL 2236 Thursday June 4 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

  1. Roger, Kent and Mark: Hall A Beamline Modifications




Notes from this meeting:

  • Need to quantify the effects of synchrotron radiation on beam properties. Is there any helicity correlated degradation?
  • For PREx-II:
  1. Need to test Hall A BCMs.
  2. Beam modulation coils were removed:
    1. Re-install. Yves will help identify location of the air core magnets on beamline
    2. Beam modulation and accelerator Fast Feedback: is there a need to pause FFB when modulation is ON? does FFB implement a digital notch filter to attenuate the modulation frequency while passing all other frequencies? (QWeak: 125 Hz for 20 s every 320 s). From Scott Higgins (July 14, 2015): Hall has paused FFB while beam modulation was on. FFB does not implement a digital notch filter to attenuate the mod freq.
  1. Install QQQ cavity triplet in Hall A beamline.
  2. Install QWeak Halo Monitors in Hall A beamline (will need new halo target).
  3. Preparing a list of instrumentation of Hall A beamline for Thia.