Difference between revisions of "PQB Meeting August 6, 2015"

From Ciswikidb
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 11: Line 11:
  
 
# Ed Folts: Hall A beamline progress report
 
# Ed Folts: Hall A beamline progress report
# John Musson: JLab BMPs and BCMs - an overview and performance [[media:Musson_August_talk.pdf]]
+
# John Musson: Overview and Expected Performance of RF Beam Diagnostics [[media:Musson_August_talk.pdf]]
  
  
Line 19: Line 19:
  
 
'''Notes from this meeting:'''
 
'''Notes from this meeting:'''
 +
 +
* Hall A progress report:
 +
# Modulation coils are in their original position and trim cards are in place, still need to connect cables to magnets.
 +
# Control system for modulation coils will be reinstated by S. Higgins.
 +
# Waiting on parts for XYQ coffin. Working on cables for the cavities.
 +
# Halo monitors were installed.
 +
  
 
* Bob Michaels is reviving the Parity DAQ including Qweak ADCs, with help from Rakitha.  Also plan to revive the Injector DAQ, most likely before beam returns.
 
* Bob Michaels is reviving the Parity DAQ including Qweak ADCs, with help from Rakitha.  Also plan to revive the Injector DAQ, most likely before beam returns.

Latest revision as of 08:03, 7 August 2015

We will meet in TL 2236 Thursday August 6 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

  1. Ed Folts: Hall A beamline progress report
  2. John Musson: Overview and Expected Performance of RF Beam Diagnostics media:Musson_August_talk.pdf




Notes from this meeting:

  • Hall A progress report:
  1. Modulation coils are in their original position and trim cards are in place, still need to connect cables to magnets.
  2. Control system for modulation coils will be reinstated by S. Higgins.
  3. Waiting on parts for XYQ coffin. Working on cables for the cavities.
  4. Halo monitors were installed.


  • Bob Michaels is reviving the Parity DAQ including Qweak ADCs, with help from Rakitha. Also plan to revive the Injector DAQ, most likely before beam returns.


  • John Musson, Functional Description of Algorithms used in Digital Receivers. JLab Tech Note 14-028 media:JLAB-TN-14-028.pdf