Difference between revisions of "PQB Meeting June 9, 2016"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "We will meet in TL 2236 Thursday June 9 at 1:00 pm EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone n...")
 
 
(5 intermediate revisions by the same user not shown)
Line 12: Line 12:
  
 
2- Halo Monitor plans in Hall A
 
2- Halo Monitor plans in Hall A
 +
 +
3- Caryn Platchi, '''Parity Beam Studies''': [[media:PQBmeeting20160609.pdf]] [[media:PQBmeeting20160609.pptx]]
 +
 +
 +
 +
 +
----
 +
 +
'''Notes from this meeting:'''
 +
 +
* Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, Pockels Cell x and y stages scan, and laser phase scan on Chopper.
 +
 +
* Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II?
 +
 +
 +
 +
[[file:Wien_screen.jpeg|left|800px|]]

Latest revision as of 09:07, 15 June 2016

We will meet in TL 2236 Thursday June 9 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Plans for PQB beam tests in June

2- Halo Monitor plans in Hall A

3- Caryn Platchi, Parity Beam Studies: media:PQBmeeting20160609.pdf media:PQBmeeting20160609.pptx




Notes from this meeting:

  • Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, Pockels Cell x and y stages scan, and laser phase scan on Chopper.
  • Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II?


Wien screen.jpeg