Difference between revisions of "PQB Meeting June 9, 2016"
Jump to navigation
Jump to search
(4 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
2- Halo Monitor plans in Hall A | 2- Halo Monitor plans in Hall A | ||
+ | |||
+ | 3- Caryn Platchi, '''Parity Beam Studies''': [[media:PQBmeeting20160609.pdf]] [[media:PQBmeeting20160609.pptx]] | ||
Line 20: | Line 22: | ||
'''Notes from this meeting:''' | '''Notes from this meeting:''' | ||
− | * Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, | + | * Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, Pockels Cell x and y stages scan, and laser phase scan on Chopper. |
* Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II? | * Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II? | ||
− | [[file:Wien_screen.jpeg | + | |
+ | |||
+ | [[file:Wien_screen.jpeg|left|800px|]] |
Latest revision as of 09:07, 15 June 2016
We will meet in TL 2236 Thursday June 9 at 1:00 pm EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Agenda:
1- Plans for PQB beam tests in June
2- Halo Monitor plans in Hall A
3- Caryn Platchi, Parity Beam Studies: media:PQBmeeting20160609.pdf media:PQBmeeting20160609.pptx
Notes from this meeting:
- Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, Pockels Cell x and y stages scan, and laser phase scan on Chopper.
- Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II?