Difference between revisions of "GTS meeting 2 28 17"
Jump to navigation
Jump to search
(Created page with "1) put voltage on gun with dummy puck, make sure FE is still small at 300kV, bakeout didn't awake field emitters 2) remove dummy puck, insert activated puck, QE scan (top pri...") |
|||
Line 1: | Line 1: | ||
− | |||
− | + | == ''Remaining Tasks'' == | |
− | + | * Put voltage on gun with dummy puck, make sure FE is still small at 300 kV, bakeout didn't awake field emitters | |
− | + | * Remove dummy puck, insert activated puck, QE scan (top priority) | |
− | + | * EES: viewers and slits and SCAM and current meters at anode and cup | |
− | + | * DC power: steerer magnets installed and cabled | |
− | + | * Shukui: get green laser into gun, power meter working, attenuator working. Laser boxes and tubes. QE scanner in place and working again. | |
− | + | * Software Control: magnets, viewers, QE scanner, current meters, Verdi laser?, SCAM, attenuator, ND filter, power meter, how are we getting VL beam? | |
− | + | * Turn ON gun, make VL beam to cup, insert slits, check functionality, try a little CW, look at ion pumps | |
+ | |||
+ | * Repeat with magnet! grab viewer image! |
Latest revision as of 08:48, 28 February 2017
Remaining Tasks
- Put voltage on gun with dummy puck, make sure FE is still small at 300 kV, bakeout didn't awake field emitters
- Remove dummy puck, insert activated puck, QE scan (top priority)
- EES: viewers and slits and SCAM and current meters at anode and cup
- DC power: steerer magnets installed and cabled
- Shukui: get green laser into gun, power meter working, attenuator working. Laser boxes and tubes. QE scanner in place and working again.
- Software Control: magnets, viewers, QE scanner, current meters, Verdi laser?, SCAM, attenuator, ND filter, power meter, how are we getting VL beam?
- Turn ON gun, make VL beam to cup, insert slits, check functionality, try a little CW, look at ion pumps
- Repeat with magnet! grab viewer image!