Difference between revisions of "November 13, 2013"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
* Injector Steering (spot move, Wiens) | * Injector Steering (spot move, Wiens) | ||
* Emittance measurement | * Emittance measurement | ||
+ | * Lifetime measurement | ||
== Test Plans == | == Test Plans == |
Revision as of 08:37, 13 November 2013
500 keV Setup
- Polarized Source
- Laser
- High Voltage Overcurrent Faults and Operation
- Beam and Diagnostics
- Beam to PCUP
- Beam Modes
- HVPS calibration
- QE Measurement
- Injector Steering (spot move, Wiens)
- Emittance measurement
- Lifetime measurement
Test Plans
- Brock cavity
- Seed laser
Future Plans
- Punchlist Media:500keV_punchlist_v2.xlsx
- Schedule
- AccIAccII
- EGG-like Calendar Media:ACCIACCII.pdf
Scene Preservation
- Slides Media:ScenePreservation.pptx