Line 12: | Line 12: | ||
# Replace leaky vent valve | # Replace leaky vent valve | ||
# Replace bad ion pump | # Replace bad ion pump | ||
+ | # Activate new photocathode (new puck): 5 mm active area at center or full active area? | ||
* Next Shutdown – December 2017: | * Next Shutdown – December 2017: | ||
# Install TE011 cavity | # Install TE011 cavity |
Revision as of 09:02, 11 September 2017
- High current runs
- Sajini - Different Orbits study: media:Sajini_different_orbits-corrector_settings_11Sept2017.xlsx
- Shutdown Plan:
- Install new YAG screen at viewer 3
- Fix existing harp and install 20 µm tungsten wire
- Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
- Replace leaky vent valve
- Replace bad ion pump
- Activate new photocathode (new puck): 5 mm active area at center or full active area?
- Next Shutdown – December 2017:
- Install TE011 cavity