Difference between revisions of "GTS meeting 9 11 17"

From Ciswikidb
Jump to navigation Jump to search
Line 12: Line 12:
 
# Replace leaky vent valve
 
# Replace leaky vent valve
 
# Replace bad ion pump
 
# Replace bad ion pump
 +
# Activate new photocathode (new puck): 5 mm active area at center or full active area?
  
  
 
* Next Shutdown – December 2017:
 
* Next Shutdown – December 2017:
 
# Install TE011 cavity
 
# Install TE011 cavity

Revision as of 09:02, 11 September 2017

  • High current runs



  • Shutdown Plan:
  1. Install new YAG screen at viewer 3
  2. Fix existing harp and install 20 µm tungsten wire
  3. Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
  4. Replace leaky vent valve
  5. Replace bad ion pump
  6. Activate new photocathode (new puck): 5 mm active area at center or full active area?


  • Next Shutdown – December 2017:
  1. Install TE011 cavity