Difference between revisions of "Wednesday December 11, 2013"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
1- New "5 MeV" Dipole update [[media:new_5Mev_dipole_Nov20.pdf]] | 1- New "5 MeV" Dipole update [[media:new_5Mev_dipole_Nov20.pdf]] | ||
− | 2- The accelerator will fund (as part of | + | 2- The accelerator will fund (as part of running the machine (RSR) in FY14): |
- New dipole magnet and a Hall probe system: GMW DTM-151 [http://www.gmw.com/magnetic_measurements/Group3/DTM-151_Specs.html]. The Group3 DTM-151 is the highest performance Hall effect | - New dipole magnet and a Hall probe system: GMW DTM-151 [http://www.gmw.com/magnetic_measurements/Group3/DTM-151_Specs.html]. The Group3 DTM-151 is the highest performance Hall effect | ||
teslameter commercially available with digital linearity and temperature correction to provide 0.01% accuracy, resolution to 2ppm, | teslameter commercially available with digital linearity and temperature correction to provide 0.01% accuracy, resolution to 2ppm, |
Revision as of 16:27, 11 December 2013
We will meet in TED 2561B on Wednesday December 11 at 3:00 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1- New "5 MeV" Dipole update media:new_5Mev_dipole_Nov20.pdf
2- The accelerator will fund (as part of running the machine (RSR) in FY14):
- New dipole magnet and a Hall probe system: GMW DTM-151 [1]. The Group3 DTM-151 is the highest performance Hall effect teslameter commercially available with digital linearity and temperature correction to provide 0.01% accuracy, resolution to 2ppm, and a temperature stability of 10ppm/°C. - New fast valve and its electronics media:275218EC_Manual.pdf media:752_1VFE.pdf. Total closing time <10 ms.
3- Latest drawing of Bubble Chamber beamline: media:Bubble_Chamber_BeamLine_Drawing_top.pdf media:Bubble_Chamber_BeamLine_Drawing_side.pdf (units of the drawing are inches) and side-view elevation:
4- Bubble Chamber progress at Argonne
5- Draft of the Accelerator Seminar talk (on Thursday January 9, 2014): media:Acc_Seminar.pdf media:Acc_Seminar.pptx. More work is still needed on Theory, Previous Experiments, and Bubble Chamber.