Difference between revisions of "Wednesday December 11, 2013"

From Ciswikidb
Jump to navigation Jump to search
Line 28: Line 28:
  
 
* New Dipole Magnet:
 
* New Dipole Magnet:
 +
 +
 +
* Beamline:
 +
 +
 +
* Bubble Chamber progress:
 +
 +
 +
* Next meeting: Wednesday January 8 or 15.

Revision as of 08:39, 12 December 2013

We will meet in TED 2561B on Wednesday December 11 at 3:00 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

1- New "5 MeV" Dipole update media:new_5Mev_dipole_Nov20.pdf

2- The accelerator will fund (as part of running the machine (RSR) in FY14):

 - New dipole magnet and a Hall probe system: GMW DTM-151 [1].  The Group3 DTM-151 is the highest performance Hall effect
teslameter commercially available with digital linearity and temperature correction to provide 0.01% accuracy, resolution to 2ppm,
and a temperature stability of 10ppm/°C.
 - New fast valve and its electronics media:275218EC_Manual.pdf media:752_1VFE.pdf. Total closing time <10 ms.

3- Latest drawing of Bubble Chamber beamline: media:Bubble_Chamber_BeamLine_Drawing_top.pdf media:Bubble_Chamber_BeamLine_Drawing_side.pdf (units of the drawing are inches) and side-view elevation:

Beamline side-view

4- Bubble Chamber progress at Argonne

5- Draft of the Accelerator Seminar talk (on Thursday January 9, 2014): media:Acc_Seminar.pdf media:Acc_Seminar.pptx. More work is still needed on Theory, Previous Experiments, and Bubble Chamber.



Notes from this meeting:

  • New Dipole Magnet:


  • Beamline:


  • Bubble Chamber progress:


  • Next meeting: Wednesday January 8 or 15.