Difference between revisions of "GTS meeting 6 18 18"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | * GTS updated plan | + | * GTS updated plan [https://logbooks/entry/3577754] |
Revision as of 06:58, 18 June 2018
- GTS updated plan [1]
- Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
- 30 minutes Sb deposition (completed)
- 60 minutes Sb deposition (heat cleaning before second attempt, puck was too hot)
- 90 minutes Sb deposition (completed)
- CST microwave studio simulations of 300 kV GTS gun: media:Gabriel_GTS_CST_18June2018.pdf