Difference between revisions of "GTS meeting 6 18 18"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
* GTS updated plan [https://logbooks/entry/3577754]
 
* GTS updated plan [https://logbooks/entry/3577754]
 +
- Magnets at 400 Amps [https://logbooks/entry/3577301]
  
  

Revision as of 07:04, 18 June 2018

  • GTS updated plan [1]
- Magnets at 400 Amps [2]


  • Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
  1. 30 minutes Sb deposition (completed)
  2. 60 minutes Sb deposition (heat cleaning before second attempt, puck was too hot)
  3. 90 minutes Sb deposition (completed)