Difference between revisions of "GTS meeting 6 18 18"

From Ciswikidb
Jump to navigation Jump to search
Line 5: Line 5:
 
* Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
 
* Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
 
# 30 minutes Sb deposition (completed)
 
# 30 minutes Sb deposition (completed)
# 60 minutes Sb deposition (heat cleaning before second attempt, puck was too hot)
+
# 60 minutes Sb deposition (heat cleaning again before second attempt, puck was too hot during activation)
 
# 90 minutes Sb deposition (completed)
 
# 90 minutes Sb deposition (completed)
  
  
 
* CST microwave studio simulations of 300 kV GTS gun: [[media:Gabriel_GTS_CST_18June2018.pdf]]
 
* CST microwave studio simulations of 300 kV GTS gun: [[media:Gabriel_GTS_CST_18June2018.pdf]]

Revision as of 07:06, 18 June 2018

  • GTS updated plan [1]
- Beamline magnets when Gun Solenoid at 400 Amps [2]


  • Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
  1. 30 minutes Sb deposition (completed)
  2. 60 minutes Sb deposition (heat cleaning again before second attempt, puck was too hot during activation)
  3. 90 minutes Sb deposition (completed)