Difference between revisions of "November 14, 2018 - Group Meeting"
Jump to navigation
Jump to search
Line 25: | Line 25: | ||
::[https://logbooks.jlab.org/entry/3624989 Low QE => Large Q Asym] | ::[https://logbooks.jlab.org/entry/3624989 Low QE => Large Q Asym] | ||
::[https://logbooks.jlab.org/entry/3625504 Helicity board signal vs. setpoint] | ::[https://logbooks.jlab.org/entry/3625504 Helicity board signal vs. setpoint] | ||
− | + | :'''LERF Status''' | |
− | :LERF Status | ||
::[https://logbooks.jlab.org/entry/3615342 LERF Driver Laser Enclosure Certified] | ::[https://logbooks.jlab.org/entry/3615342 LERF Driver Laser Enclosure Certified] | ||
::LERF PSS Certification - Support for Gun and Laser enable | ::LERF PSS Certification - Support for Gun and Laser enable |
Revision as of 17:52, 15 November 2018
Fall 2018 Run, January 2019 SAD and Beyond...
2018 Fall Run Period
- Program through Christmas
- Tue 11/20 - Hall A turns off for rest of the year
- Mon 11/26 - Linac and Pass changes (ABCD = Off/4/2/5.5) => Wien change for B
- Mon 12/10 - Linac and Pass changes (ABCD = Off/4/3/5.5) => Wien change for B
- Thu 12/20 - Machine off at 8am for Holiday break
- Gun2 QE
- High Polarization in Hall B
- SF6 Relief Valve
- Easy Button Not So Easy
- Vertical Wien Filter Current Instability
- PQB Studies
- LERF Status
- LERF Driver Laser Enclosure Certified
- LERF PSS Certification - Support for Gun and Laser enable
January 2019 CEBAF SAD
- Heat/Activate Gun2 Photocathode SLSP
- John ordered small tank to top off SF6
- Install RTP Pockels cell
- Implement 1kV anode safe floating bias supply inline with anode-picoammeter
- Fiducialize IHA2D00 for Bubble
- Restore/HCO helicity magnets?
- Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load
- Install DBR?