Line 29: | Line 29: | ||
::LERF PSS Certification - Support for Gun and Laser enable | ::LERF PSS Certification - Support for Gun and Laser enable | ||
− | === | + | === 2019 === |
− | :[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18580 Heat/Activate Gun2 Photocathode SLSP] | + | :CEBAF SAD |
− | :John ordered small tank to top off SF6 | + | ::[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18580 Heat/Activate Gun2 Photocathode SLSP] |
− | :[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18582 Install RTP Pockels cell] | + | ::John ordered small tank to top off SF6 |
− | :Implement 1kV anode safe floating bias supply inline with anode-picoammeter | + | ::[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18582 Install RTP Pockels cell] |
− | :[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18562 Fiducialize IHA2D00 for Bubble] | + | ::Implement 1kV anode safe floating bias supply inline with anode-picoammeter |
− | :Restore/HCO helicity magnets? | + | ::[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18562 Fiducialize IHA2D00 for Bubble] |
− | :Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load | + | ::Restore/HCO helicity magnets? |
− | :[https://logbooks.jlab.org/entry/3625601 Install DBR?] | + | ::Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load |
+ | ::[https://logbooks.jlab.org/entry/3625601 Install DBR?] | ||
===Beyond=== | ===Beyond=== |
Revision as of 17:52, 15 November 2018
Fall 2018 Run, January 2019 SAD and Beyond...
2018 Fall Run Period
- Program through Christmas
- Tue 11/20 - Hall A turns off for rest of the year
- Mon 11/26 - Linac and Pass changes (ABCD = Off/4/2/5.5) => Wien change for B
- Mon 12/10 - Linac and Pass changes (ABCD = Off/4/3/5.5) => Wien change for B
- Thu 12/20 - Machine off at 8am for Holiday break
- Gun2 QE
- High Polarization in Hall B
- SF6 Relief Valve
- Easy Button Not So Easy
- Vertical Wien Filter Current Instability
- PQB Studies
- LERF Status
- LERF Driver Laser Enclosure Certified
- LERF PSS Certification - Support for Gun and Laser enable
2019
- CEBAF SAD
- Heat/Activate Gun2 Photocathode SLSP
- John ordered small tank to top off SF6
- Install RTP Pockels cell
- Implement 1kV anode safe floating bias supply inline with anode-picoammeter
- Fiducialize IHA2D00 for Bubble
- Restore/HCO helicity magnets?
- Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load
- Install DBR?