Line 31: | Line 31: | ||
=== 2019 === | === 2019 === | ||
:'''JAN 2 - JAN 22 (3 week SAD/PSS period)''' [https://accweb.acc.jlab.org/calendar/view-outlook?calendar=1&year=2019&week=1 SAD] | :'''JAN 2 - JAN 22 (3 week SAD/PSS period)''' [https://accweb.acc.jlab.org/calendar/view-outlook?calendar=1&year=2019&week=1 SAD] | ||
− | ::[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18580 Heat/Activate Gun2 Photocathode SLSP] | + | ::MUST |
− | ::John ordered small tank to top off SF6 | + | :::[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18580 Heat/Activate Gun2 Photocathode SLSP] |
− | ::[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18582 Install RTP Pockels cell] | + | :::John ordered small tank to top off SF6 |
− | + | :::[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18582 Install RTP Pockels cell] | |
::[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18562 Fiducialize IHA2D00 for Bubble] | ::[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18562 Fiducialize IHA2D00 for Bubble] | ||
− | :: | + | ::SHOULD |
::Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load | ::Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load | ||
− | ::[https://logbooks.jlab.org/entry/3625601 Install DBR?] | + | :::Implement 1kV anode safe floating bias supply inline with anode-picoammeter |
+ | ::LIKE | ||
+ | :::Restore/HCO helicity magnets? | ||
+ | :::[https://logbooks.jlab.org/entry/3625601 Install DBR?] | ||
: '''JAN 30 - APR 7 (10 week run period)''' | : '''JAN 30 - APR 7 (10 week run period)''' |
Revision as of 19:25, 15 November 2018
Fall 2018 Run, January 2019 SAD and Beyond...
2018 Fall Run Period
- Program through Christmas
- Tue 11/20 - Hall A turns off for rest of the year
- Mon 11/26 - Linac and Pass changes (ABCD = Off/4/2/5.5) => Wien change for B
- Mon 12/10 - Linac and Pass changes (ABCD = Off/4/3/5.5) => Wien change for B
- Thu 12/20 - Machine off at 8am for Holiday break
- Gun2 QE
- High Polarization in Hall B
- SF6 Relief Valve
- Easy Button Not So Easy
- Vertical Wien Filter Current Instability
- PQB Studies
- LERF Status
- LERF Driver Laser Enclosure Certified
- LERF PSS Certification - Support for Gun and Laser enable
2019
- JAN 2 - JAN 22 (3 week SAD/PSS period) SAD
- MUST
- Heat/Activate Gun2 Photocathode SLSP
- John ordered small tank to top off SF6
- Install RTP Pockels cell
- Fiducialize IHA2D00 for Bubble
- SHOULD
- Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load
- Implement 1kV anode safe floating bias supply inline with anode-picoammeter
- LIKE
- Restore/HCO helicity magnets?
- Install DBR?
- MUST
- JAN 30 - APR 7 (10 week run period)
- Similar to this run with A=30, B=polarized, C=50-70uA, D
- Hall A run short until MAR 7, then a 3 day PQB tests a 1-pass 70uA
- APR 8 - JUN 2 (8 week SAD period)
- PQB Studies?
- Early opportunity Gun2 electrode 200KV
- JUN 10 - AUG 11 (9 week run period)
- Hall A PREX polarized 70uA 1 pass @ 499 MHz
- Hall B unpolarized 100nA 5 pass @ 499 MHz
- Hall C unpolarized 50-90 uA 3-5 pass @ 499 MHz for 3 weeks
- AUG 12 - OCT 25 (11 week SAD period)
- Gun2 electrode 200KV
- Power Wiens from new PS and HVPS?
- NOV 1 - DEC 19 (7 week run period)
- Hall A CREX polarized 150uA 1 pass @ 499 MHz
- Hall B polarized 5 pass @ 250 MHz
- Hall C polarized 30uA 5 pass @ 250 MHz
- Hall D 5 pass @ 250 MHz