Difference between revisions of "Wednesday March 5, 2014"
Jump to navigation
Jump to search
Line 24: | Line 24: | ||
* Our Budget Request: [[media:Bubble_FinalCost.pdf]] [[media:Bubble_FinalCost.pptx]] | * Our Budget Request: [[media:Bubble_FinalCost.pdf]] [[media:Bubble_FinalCost.pptx]] | ||
− | - Fast Vale and Dipole Magnet | + | - Fast Vale and Dipole Magnet are approved as part of RSR/SRC. |
− | - Other expenses | + | - Other expenses (Super Harps, Dumps, ...) were included in the ARD/SRC request but not yet approved. |
* Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble Chamber beamline, in the radiator chamber. | * Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble Chamber beamline, in the radiator chamber. |
Revision as of 14:37, 6 March 2014
We will meet in TL 2236 on Wednesday March 5 at 3:00 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1- Bubble Chamber progress at Argonne
2- Bubble Chamber Schedule at JLab
3- How would the 5D beamline look for the Bubble Chamber test in October 2014?
Notes from this meeting:
- The new chiller has arrived at Argonne
- The Bubble Chamber safety reviews will be completed soon (Pressure System completed, waiting on Mercury Review) and a copy will be sent to JLab by the end of March to start the process here.
- Our Budget Request: media:Bubble_FinalCost.pdf media:Bubble_FinalCost.pptx
- Fast Vale and Dipole Magnet are approved as part of RSR/SRC. - Other expenses (Super Harps, Dumps, ...) were included in the ARD/SRC request but not yet approved.
- Fast Valve was ordered. The Valve will be installed upstream of DP cans. The gauge will be installed at the end of Bubble Chamber beamline, in the radiator chamber.
- Test Beamline:
- Ask for thermal analysis of the flange radiator to determine the operational beam current. - Design collimator using GEANT4. Part of the collimator could be positioned inside the pressure vessel. At some point, Argonne ordered Cu material that could be available for us.
- Test Schedule:
- Start the Experiment Readiness Review process with a meeting with Arne and Rolf.