Difference between revisions of "Wednesday March 26, 2014"

From Ciswikidb
Jump to navigation Jump to search
Line 16: Line 16:
  
 
5- New "5 MeV" Dipole update and shielding of Earth's magnetic field
 
5- New "5 MeV" Dipole update and shielding of Earth's magnetic field
Magnet Drawings:
 
  JL0008751_DL_COIL_SPACER.pdf [[media:L0008751_DL_COIL_SPACER.pdf]]
 
  JL0008736_DL_MAGNET_CORE-BOTTOM.pdf [[media:JL0008736_DL_MAGNET_CORE-BOTTOM.pdf]]
 
  JL0008100_DL_MAGNET_COIL.pdf [[media:JL0008100_DL_MAGNET_COIL.pdf]]
 
  JL0011326_DL_TERMINAL_COVER.pdf [[media:L0011326_DL_TERMINAL_COVER.pdf]]
 
  JL0008745_DL_MAGNET_STEEL.pdf [[media:L0008745_DL_MAGNET_STEEL.pdf]]
 
  JL0008102_DL_MAGNET_ASSEMBLY.pdf [[media:JL0008102_DL_MAGNET_ASSEMBLY.pdf]]
 
  JL0008098_DL_MAGNET_CORE-TOP.pdf [[media:JL0008098_DL_MAGNET_CORE-TOP.pdf]]
 
  
 
6- Can we get a handle on Earth's field by measuring the beam energy simultaneously in the 2D Spectrometer? In this case we need to add another BPM and two Quads (could be weak) to this line.
 
6- Can we get a handle on Earth's field by measuring the beam energy simultaneously in the 2D Spectrometer? In this case we need to add another BPM and two Quads (could be weak) to this line.

Revision as of 10:13, 28 March 2014

We will meet in TL 2236 on Wednesday March 26 at 3:00 pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 4402297, followed by “#”

Agenda:

1- Bubble Chamber progress at Argonne

2- Bubble Chamber Schedule at JLab media:Bubble_Chamber_Schedule.pdf media:Bubble_Chamber_Schedule.pptx. What about a dry run at JLab? We can bring the Bubble Chamber from HIGS to JLab for background studies with no beam.

3- How would the 5D beamline look for the Bubble Chamber beam test? media:Bubble_Chamber_BeamTest_top.pdf media:Bubble_Chamber_BeamTest_side.pdf

4- Pics and dimensions along the path the Bubble Chamber will take from "curb" to beam line media:140325_BubbleChamberLogistics2.pdf

5- New "5 MeV" Dipole update and shielding of Earth's magnetic field

6- Can we get a handle on Earth's field by measuring the beam energy simultaneously in the 2D Spectrometer? In this case we need to add another BPM and two Quads (could be weak) to this line.