Difference between revisions of "2021-03-17"
Jump to navigation
Jump to search
(Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...") |
|||
Line 25: | Line 25: | ||
==== <u>New items for discussion:</u> ==== | ==== <u>New items for discussion:</u> ==== | ||
− | * ERR Final Report & discussion - to include target FSD (Mike) | + | * [[media:ERRCloseOutReport-UITFHRSDIrradiation.pdf|ERR Final Report]] & discussion - to include target FSD (Mike) |
− | * Change request submitted to SAD Coordination Task Force - awaiting evaluation. (Mike) | + | * [[media:WastewaterIrradiation_McCaughan_long SAD change request.docx|Change request]] submitted to SAD Coordination Task Force - awaiting evaluation. (Mike) |
* Beam Studies & Optics Characterization: Model development + Planned studies (John, Xi) | * Beam Studies & Optics Characterization: Model development + Planned studies (John, Xi) | ||
* Gun heat and reactivation required (Poelker) | * Gun heat and reactivation required (Poelker) |
Revision as of 13:28, 16 March 2021
Meeting Information
Connecting
To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
- To join via phone, use one of the following numbers and the Conference ID: 946721076.
- Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
Agenda
Schedule
Rough timetable:
- HDIce run2b completed (March 13)
- Beam studies until cryo transition to CMTF
- PSS Certification immediately afterwards
- CMTF tests with C75-1 (late-March - early-June). More refined CMTF schedule / testing duration?
- UITF beamline Modification in parallel to install new beamline
- Supplementary Shielding Installation: Mid-June
- Beamline Commissioning / Test Plans / Shielding Verification: Late June / Early July
- First commissioning of water irradiation beamline in ~July/August
Short term plan[2]
New items for discussion:
- ERR Final Report & discussion - to include target FSD (Mike)
- Change request submitted to SAD Coordination Task Force - awaiting evaluation. (Mike)
- Beam Studies & Optics Characterization: Model development + Planned studies (John, Xi)
- Gun heat and reactivation required (Poelker)
- Engineering: BCM cabling completed, MQZ installed in Wien filter location for emittance studies, HDice line locked out and blanked off after FC#4. Other?
- Other business